Digital Production Control - 04.06.02 Returning the Base Bid and New Change Orders to DPC Mode

  • May 6, 2020
  • 0 replies
  • 56 views

daniel.wal

Failure to follow the instructions below will cause your DPC project to fail to retrieve information from Quick Bid correctly. These steps must be followed as documented, if you have any questions, contact Support.

After the Project Manager has received all DPC Change Files from the field and imported them and has made all the necessary changes to the base bid and any Change Orders,

  • Starting with the most recently added Change Order, the Project Manager clicks the DPC button The DPC Button flips a bid or change order into DPC mode to convert that Change Order to DPC mode
  • He or she then returns to the Projects Tab
  • Select the next newest Change Order, click on Takeoff Tab
  • Flips it to DPC Mode
  • Repeating for all newly added Change Orders (those that were not previously sent to the field) until he or she works his or her way up to the Base Bid
  • Lastly, flip the Base Bid back to DPC Mode

Change Orders that were previously set to "DPC Mode" but have not been "Unlocked" or changed do not have to go through this process again, skip them. Only newly added or modified Change Orders must be 're-flipped' to DPC Mode, one-at-a-time.

You must open the Takeoff Tab in each newly added Change Order one-at-a-time, click the DPC Button, then return to the Projects Tab and select any other Change Order added after the original Bid Package was sent to the field and repeat this process before setting the Base Bid back to DPC Mode.

DPC only requests updates from Quick Bid for a Change Order when the DPC Button is clicked within that Change Order.

Do not use the Project View drop-down or tab in the Condition Window to switch between Change Orders or the Base Bid, return to the main Projects Tab.

The Base Bid is the last bid in the project that should be set to DPC Mode, after all child bids.

Do not use the Bid View drop-down to switch between change orders or the base bid

As mentioned in previous articles, the Project Manager must receive all work from the field (foremen) before creating a new DPC Package. The new DPC Package replaces the Project on the foreman's machine - any un-sent work will be lost.

click here to view the previous article Unlocking a Bid Sending Updated Bid to Field click here to view the next article