The Projects Tab displays a summary for each Project (bid, job, etc.) in the current database.
Program Tabs
When a Database (or Folder) is Selected (not a Project/Bid)
When you select a Project on the Projects Tab (when you click on a single Project), the Takeoff, Summary, and Estimate Tabs for that Project become visible.
The Projects, Project Express, Resources, and Trending Tads are visible when a database is selected (not a Project/Bid)
When a Project/Bid is Selected
(In addition to those four, the Takeoff, Summary, and Estimate Tabs become visible when a Project/Bid is selected)
- The Bid Date column is updated automatically when a project is loaded from a Planroom. You can set or change this in the Cover Sheet (see "Color Code" further down in this article), however if you update this project using an OSX file from a Planroom, this date will be reset to whatever the Planroom specifies as the "Bid Date".
- The Copy From and Copy Timestamp columns are populated when a Project is copy and pasted or duplicated within the same database. The Copy From field indicates the original (Project) Number and the timestamp (the date and time) when the copy was made (not populated if you copy a bid from another database).
- Click on the desired column header (i.e. (Project) No., Project Name, Status) and an arrow will appear next to the group title: a down arrow indicates the list is sorted in descending order, and an up arrow, ascending.
- Adjust the order of columns by grabbing a column header and dragging it to a new position.
- Double-click on a Project to open the Takeoff Tab for the selected Project.
- If you have a DPC license, you may see additional Program Tabs, see the DPC User Guide for more information, under Related Articles.
Use filtering and grouping on the Projects Tab to organize/find Projects easier; these are explained in the articles that follow.
Bid Date Color Code
On-Screen Takeoff color codes the Bid Date shown on the Project Tab (taken from the Cover Sheet) to help you quickly identify Projects you need to work on today/soon.
- Black - Past date
- Blue - Future date
- Red - Today's date
Color-coding is driven by the Bid Date in the Cover Sheet, see Related Articles for more information on the Cover Sheet.
If you have downloaded a Planroom project (an OSX Project file), the Bid Date is set by the information in that project file. You can edit the Bid Date, but when the project updates (to check for updated plan files), that Bid Date may change to match what the Planroom publishes as "bid due date".
Project Flags
In the far-left column, you may see one or more icons that indicate the state of a Project.
Here's what each icon means:
Icon | What it means... |
---|---|
![]() | Project connected to Quick Bid (Interactive or Manual). See Connecting and Disconnecting Interactive Bids for more information. |
![]() | Auto Name is running on this Project's plans. See Related Articles for details on using this feature. |
![]() | Auto Name was interrupted while uploading/processing this Project's plans. To restart the process, click the icon. See Related Articles for details on using this feature. |
DPC Users see different statuses on the Projects Tab, covered in: Digital Production Control 3.98 - 01.06.01 The Bids Tab
![]() | Filtering the Project Tab ![]() |